Making IVDR Work in Combined Studies: Scientific & Operational Lessons from 40+ Programs

Combined studies, clinical trials that simultaneously investigate a medicinal product and an IVD under both the Clinical Trials Regulation (CTR) and the IVDR, are among the most complex regulatory challenges in precision medicine today. The lack of a coordinated EU assessment means sponsors face separate national submissions, divergent NCA interpretations, and timelines that can stretch 6-12 months beyond what was planned.

Last week, I presented at the 16th Clinical Biomarkers & Companion Diagnostics Summit Europe in London, sharing data and lessons from over 40 combined programs that MDx CRO has managed across 20+ EU countries. This article distils the key findings from that presentation: what triggers IVDR performance study requirements, why the same protocol can get three different answers from three NCAs, the top RFIs we see across programs, and how the regulatory landscape is evolving with MDCG 2025-5 and the December 2025 Health Services Pack.

Whether you are a pharmaceutical sponsor planning your first combined study, or a regulatory affairs professional navigating the dual-track CTR/IVDR submission process, this article gives you the operational intelligence that no guidance document provides.

Name
Checkboxes

The Combined Studies Bottleneck: Why This Matters Now

The numbers tell the story. According to the EU COMBINE Analysis Report 2024, there were 402 combined study applications across the EU, of which 343 were CTR/IVDR combinations, and 86% of those were multinational. The mean approval time was 137 days, but the range was enormous: 45 to 267 days depending on the country, the submission pathway, and the quality of the initial dossier.

The root cause is structural. There is no coordinated IVDR assessment across Member States. Each country evaluates the performance study component independently, using national portals, national forms, and critically, national interpretations of the same regulation. For sponsors running multinational oncology trials with a companion diagnostic, this means multiplicative complexity: every additional country adds not just a submission, but a potentially different regulatory conclusion about whether a Performance Study Application (PSA) is even required.

And the volume is growing. Industry estimates project over 3,000 IVD submissions expected by 2029 as more CDx-driven oncology programs reach the EU. The system is already under strain.

This is the environment in which every combined study sponsor now operates. The question is not whether you will encounter divergent NCA opinions, it is how you prepare for them.

Same protocol, same device, three different answers.

The case presented at CDx Europe involved a pharmaceutical sponsor planning a multinational Phase 1b/2 oncology trial across France, Germany, and Spain. The study used a CE-marked companion diagnostic to run central testing retrospectively on leftover tumour samples, after enrolment was complete, purely as exploratory biomarker analysis. No additional invasive procedures. No impact on protocol-mandated treatment decisions. The sponsor sought pre-submission advice from three Member State competent authorities, presenting the same protocol and the same scientific rationale to each.

The three responses were incompatible.

NCA 1 concluded that no PSA was required, it accepted the sponsor’s argument that the activity was purely exploratory and non-interventional.

NCA 2 took the opposite position: because the assay was being used outside the scope of its CE-marked intended purpose, and because discrepant results would be communicated to investigators who could potentially act on them, it classified the study as interventional and required full PSA authorisation.

NCA 3 had not issued a definitive answer within the consultation period. This authority lacks a formal structured consultation procedure for performance studies and typically responds by email without fixed timelines.

When we presented this at the conference, there was an audible reaction in the room. Several attendees nodded immediately, this clearly resonated with their own experience. The most revealing question came from a regulatory affairs director at a mid-size pharmaceutical company who asked: “If the strictest authority changes its mind on appeal and agrees with the others, do we then need to explain to the permissive authority why we did something they told us we didn’t need to do?”

That question captures the operational absurdity of the current system perfectly. Sponsors are caught between harmonising upward, following the strictest requirement everywhere, which creates unnecessary burden in permissive jurisdictions, and harmonising downward, which creates compliance risk in the strictest one.

How Was It Resolved?

No harmonised consensus was reached between the three authorities. The sponsor appealed to the strictest authority in late 2025, providing additional justification and citing the fact that the most permissive authority had accepted the same protocol without any submission. By early 2026, the sponsor was cautiously optimistic that the appeal would succeed.

In parallel, they prepared contingency documentation for a dual-track approach: a full PSA in the country requiring it, a Performance Study Notification (PSN) in the country where the outcome remained uncertain, and no submission in the country that had cleared the protocol outright. Each country would effectively follow its own regulatory requirement.

Timeline impact: The divergent opinions introduced approximately 4–6 months of delay to the diagnostic component of the trial, encompassing multiple pre-submission consultation rounds, country-specific dossier preparation, appeal proceedings, and the need to compile and translate Annex XIV documentation for each jurisdiction independently.

There is currently no formal escalation or conflict-resolution pathway for performance study assessments. This is precisely the structural gap the COMBINE programme’s coordinated assessment pilot is intended to address.

What Triggers IVDR Performance Study Requirements?

Understanding the regulatory pathways is critical for any combined study. The IVDR establishes three routes, and the distinction between them determines everything: your timeline, your documentation burden, and whether your study can start at all.

Article 58.1 Authorisation Required

This applies to non-CE-marked devices or devices used outside their intended purpose. The process involves a 25-day validation phase followed by a 45-day review. You need full PSA authorisation when the study involves surgically invasive sample-taking for study purposes only, when it is an interventional clinical performance study, or when there are additional invasive procedures or risks beyond standard care.

Article 58.2 Notification Pathway

This applies to companion diagnostics using leftover samples only, where results do not influence treatment during the trial. The pathway is immediate or NCA-dependent after validation, depending on the Member State.

Article 70 CE-Marked Devices

This is a 30-day notification route for CE-marked devices used within their intended purpose but involving additional invasive or burdensome procedures beyond normal use. A critical nuance: if a CE-marked IVD is studied outside its intended purpose, the Article 70 notification route does not apply, it must be assessed under Article 58 instead.

The Key Decision Factors

From our experience across 40+ combined programs, the questions that determine which pathway applies and where NCAs diverge, are consistent:

  • CE mark status: for the specific trial use (intended purpose) not just whether the device has a CE mark, but whether the trial use falls within the marked scope
  • Whether results impact medical management: this is the most contested threshold, as “interventional” in the IVDR context carries a different meaning from “interventional” in clinical trial legislation
  • Study design: interventional vs observational
  • Sample type: fresh vs leftover, and the level of invasiveness required to collect them
  • Risk profile: additional procedures vs standard care
  • Whether device endpoints are clearly distinguished: from drug endpoints

Top 12 RFIs From 40+ Combined Programs

This is the data MDCG guidance documents do not provide. Over 40 combined programs, these are the most frequent Requests for Information (RFIs) we have received from NCAs and Ethics Committees across Europe:

1. Insufficient analytical validation (GSPR 9.1a). The test is a clinical trial assay, prototype, or lab-developed test (LDT) and was not developed under full design control. This may be accepted in US early-phase trials but is a common reason for rejection in the EU.

2. Insufficient data supporting the chosen cut-off. A small number of samples were used for cut-off validation. NCAs expect robust, data-driven rationales, not theoretical arguments.

3. Lacking or vague definitions of primary endpoints related to IVD performance, and the absence of a statistical analysis plan for the device component.

4. Informed Consent Form (ICF) lacks performance study-specific content. This is extremely common in combined CT/PS ICFs. Authorities regularly request revision in lay-user language that clearly distinguishes participation in the drug trial from participation in the diagnostic study.

5. Inconsistent objectives between the clinical trial application and performance study documentation. When the CPSP says one thing and the CTA says another, expect an RFI.

6. Incomplete risk plans and reports, with insufficient evaluation in the Investigator’s Brochure of how inaccurate test results could impact the clinical trial, especially for high-toxicity therapies.

7. Investigator and site documentation lacking PS references, required translations, or country-specific insurance certificates.

8. Lack of consideration towards monitoring the IVD study under ISO 20916, especially in sponsor-CRO or multicentre settings.

9. Divergent views between Ethics Committees and NCAs on risk, burden, or benefit, sometimes within the same country.

10. Use of leftover samples for future research without clear documentation on traceability, consent, or ethical approval.

11. Safety monitoring procedures in the CPSP not aligned with IVDR Article 74 and MDCG 2024-4.

12. Scientific inaccuracies in the CPSP, IB, and technical documentation, simple errors that erode credibility and trigger additional scrutiny.

What “Device-Specific Endpoints” Actually Means

One of the most common mistakes we see in combined studies is sponsors relying solely on drug efficacy endpoints (ORR, PFS, OS) as evidence of IVD performance. Under the IVDR and MDCG 2025-5, performance studies must generate data that establish or confirm device performance, not drug performance.

Analytical Endpoints (Often Used in Phase 1/2 Studies)

These include reportable rate, invalid-result rate, repeat-test rate, and assay failure rate; precision and reproducibility in the clinical setting; and accuracy at clinically relevant cut-offs.

Clinical Endpoints (CDx-Type, Often Used in Phase 3 and Bridging)

These include concordance with a clinically valid reference assay (PPA, NPA, OPA); diagnostic sensitivity and specificity vs clinical status; clinical outcomes studies in the IVD-selected group linked to drug endpoints; and clinical bridging studies.

What Is Not Sufficient as a Sole Endpoint

Turnaround time alone, and drug efficacy endpoints (ORR, PFS, OS) without device-specific performance measures.

Case Study: From Rejection to 8-Country Approval

One of the programs presented in detail involved an NGS-based CDx used to detect a specific mutation for targeted therapy patient eligibility in a rare tumour indication. It was a Phase 3 global trial with an interventional combined performance study across 30+ EU sites.

The Initial Rejection

The first EU submission was rejected. The reasons were typical of what we see repeatedly:

  • Incomplete analytical performance data vs GSPR 9.1(a) at the mutation cut-off
  • Weak linkage between biomarker, clinical condition, and treatment, a scientific validity gap
  • Under-developed risk management for false negatives in a high-toxicity therapy

What We Did

MDx CRO conducted a full gap analysis and remediation covering the Scientific Validity Report (SVR), Analytical Performance Report (APR), CPSP, and risk file versus Annex XIII requirements. We rewrote the CPSP with device-specific treatment-decision endpoints, strengthened the analytical data at the decision threshold, and quantified the false-negative impact in the risk management file.

The Outcome

Harmonised resubmission to 8 Member States. All RFIs resolved. Approvals in all 8 countries, within 4 months.

This case illustrates a pattern we see consistently: the initial submission fails not because the science is weak, but because the documentation does not speak the language the NCAs expect. The same data, presented differently, achieves a completely different result.

The Most Costly Mistake Sponsors Make

The single most expensive mistake we have seen sponsors make in the IVDR portion of a combined study is treating the performance study application as an afterthought, something to be “bolted on” after the clinical trial application is already in motion.

In one program, the sponsor had not engaged with IVDR requirements until approximately three months before planned first-patient-in. At that point they discovered that a PSA was required in multiple Member States, that documentation requirements were not harmonised across those countries, and that each required different local forms, different ethics committee interactions, and in some cases certified translations.

The result was a nine-month delay to the European portion of the trial and an estimated additional cost in the range of €800,000-€1.2 million when accounting for CRO renegotiation, site re-engagement fees, amended contracts, and the opportunity cost of delayed clinical data.

This is not an outlier. Industry survey data shows that a significant proportion of sponsors experience 6–12 months of IVDR-related delay in combined programs, with some reporting delays beyond 12 months. The structural cause is always the same: the pharmaceutical team and the diagnostics team are operating on disconnected timelines, and the IVDR submission is not integrated into the master trial timeline from the outset.

Wave Planning: The Operational Playbook

Not all EU Member States are equal when it comes to combined study submissions. One of the practical tools shared at the conference was our wave planning approach, a strategic framework for sequencing country activations based on regulatory architecture, not just commercial priority.

Wave 1: Speed, Parallel/Combined Processes

Spain offers parallel review, with submission to both AEMPS via the portal and the Ethics Committee (usually via email). Total timeline: approximately 85 days.

Belgium uses a consolidated review via CESP where the NCA and EC coordinate and issue a single opinion. Timeline: approximately 60 days.

These are faster because the EC and NCA review simultaneously, not sequentially.

Wave 2: Sequential Requirements

Germany, Austria, and Hungary all require EC approval first, followed by NCA submission. This adds the full EC timeline (46–166 days) before the NCA clock even starts. Total timelines: 135–267 days.

Wave 3: Administrative Complexity

Bulgaria requires notarised and apostilled Powers of Attorney, sworn translations, and physical courier submissions.

Poland requires paper copy submissions to both the EC and NCA, including wet-ink signed site documents, sworn translations, and stricter requirements demonstrating the Sponsor’s business registration and Power of Attorney.

Ireland has non-harmonised reviewers, causing inconsistent RFI rounds.

Why Wave Planning Matters

Typically, it is strategic to avoid submitting to high-administrative-burden countries in Wave 1. For example, Poland necessitates that the entire submission package is delivered to the EC and NCA via courier in printed form with wet-ink signatures. It is more efficient to submit first to countries with accessible pathways so that feedback from RFIs and lessons learned can be incorporated from the start for the more labour-intensive submissions.

The strategy: stagger activation by submission architecture and administrative burden, not just by regulator consolidation.

Illustration of European map showing estimated PSA approval timelines and submission complexities for MedTech products in the context of IVDR compliance.
Visual overview of European regions highlighting approval timelines and submission challenges for MedTech companies navigating IVDR requirements in combined studies.

How MDCG 2025-5 Is Changing the Landscape

MDCG 2025-5, published in June 2025, is the first dedicated Q&A guidance specifically addressing IVDR performance studies comprehensively. It covers 54 questions across topics that sponsors and NCAs have been debating since 2022, including:

  • A regulatory pathway decision tree (Appendix I) providing a structured framework for determining whether a planned activity requires a PSA, a PSN, or no submission at all
  • Clarification that “interventional” in the IVDR context meaning the results may influence patient management carries a different meaning from “interventional” as used in clinical trial legislation. This conflation has caused significant confusion
  • A working definition of “leftover samples” and the conditions under which they trigger notification rather than full application requirements
  • Guidance on combined studies including sponsor responsibilities, substantial modification handling across both the CTR and IVDR pathways, and the role of the performance study investigator

Are NCAs Following It?

Partially, and unevenly. Some authorities have begun aligning their pre-submission guidance with the decision-tree logic. Others continue applying their own interpretations, particularly on the definition of “interventional” which remains the most contested threshold.

The guidance is explicitly non-binding: MDCG 2025-5 itself states it cannot be regarded as reflecting the official position of the European Commission and that only the Court of Justice of the EU can give binding interpretations. In practice, guidance adoption across Member States typically lags publication by 12–18 months before a clear majority are operating consistently with it.

The Health Services Pack and the Biotech Act: Will It Actually Simplify Combined Studies?

In December 2025, the European Commission proposed two complementary pieces of legislation as part of a broader health services package. The first is a targeted revision of the MDR and IVDR, aimed at simplifying the existing regulatory framework. The second is the Biotech Act, which proposes amendments to the Clinical Trials Regulation that are directly relevant to combined studies.

What the Biotech Act Changes for Combined Studies

This is the more consequential development. The Biotech Act explicitly introduces a single integrated application for combined studies. Under the current framework, sponsors must seek authorisation of the clinical trial under the CTR and the performance study under the IVDR entirely independently separate portals, separate assessments, separate timelines, separate Member State interactions.

The Biotech Act proposes to eliminate that dual-track requirement. Instead, the sponsor would submit a single application covering both the investigational medicine and the IVD through a combined authorisation process managed under the CTR. That assessment would be led and coordinated by a Reporting Member State (RMS), with coordinated approvals across participating countries.

The proposal also accelerates CTR timelines generally, reducing the multinational CTA review from 106 days to 75 days, and as low as 47 days when no information request is issued.

My Assessment

This is not wishful thinking for the first time, there is a concrete legislative mechanism on the table that directly addresses the structural root cause of combined study delays. If adopted as proposed, it would be a genuine step-change.

However, three cautionary notes:

Legislative timeline. Even with political priority, realistic adoption and implementation timelines are 18–24 months from proposal. Do not expect sponsors to be able to use the single-application pathway before late 2027 at the earliest.

Implementation gap. CTIS will need to be updated to accept performance study documentation alongside the CTA, and Member State competent authorities will need to build assessment capacity for the IVD components within their CTR review teams.

The COMBINE pilot is the bridge. The COMBINE programme’s Project 1 pilot, launched on 13 June 2025, is already testing an “all-in-one” coordinated assessment approach. Sponsors who participate now are effectively rehearsing for the future framework.

The December 2025 package does have the potential to fundamentally simplify combined studies. But sponsors working in 2026 are still operating under the current framework. The practical advice remains: use the COMBINE pilot if you can, plan for Member State divergence if you can’t, and build your combined study submission strategy on the assumption that the current dual-track system will be in place until at least late 2027.

The #1 Mistake Sponsors Make in Their First Combined Study

They assume the IVDR performance study is the diagnostic manufacturer’s problem, not theirs.

The pharmaceutical sponsor designs the trial, defines the biomarker strategy, selects the assay, and writes the protocol. But when the conversation turns to the IVDR submission, they expect their diagnostic partner to handle it independently.

The reality is that under Article 2(57) of the IVDR, the “sponsor” is whichever entity takes responsibility for the initiation, management, and financing of the performance study and in a combined study, particularly in early-phase trials, that is often the pharmaceutical company itself.

This disconnect produces predictable failures:

  • The drug application is submitted through CTIS months before the PSA is even drafted
  • The diagnostic partner lacks access to the clinical trial protocol, site-level information, and country-specific documentation needed to complete the Annex XIV dossier
  • When an NCA issues an RFI at the interface between the two applications, neither team owns the response

MDCG 2022-10 is explicit: the clinical trial sponsor is responsible for overall compliance of products used in the trial, including the IVDR. Where a sponsor uses a CE-marked IVD outside its intended purpose, it assumes manufacturer responsibilities under Article 16(1).

The fix is straightforward: from Day 1 of trial design, the PSA workstream sits inside the integrated trial timeline, with a named owner, shared document management, and joint governance between pharmaceutical and diagnostics teams. Sponsors who do this avoid most problems. Sponsors who don’t are the ones calling us nine months before database lock.

How Much Time Does Expert Guidance Save?

Based on our experience across 40+ combined programs, working with a CRO that has specific IVDR and IVD regulatory expertise saves an average of 3 to 5 months compared to in-house teams or generalist CROs approaching combined studies for the first time.

The savings accumulate in three areas:

Pre-submission strategy (4–6 weeks saved). A specialist knows which Member States to sequence in Wave 1, what each authority actually expects beyond the statutory minimum, and which borderline classification questions need to be resolved before any dossier is submitted. Preventing a single misclassification avoids months of remediation.

Documentation preparation (4–8 weeks saved). Generalist CROs frequently prepare a single PSA dossier and submit it identically across all Member States. A specialist prepares country-adapted packages from the outset correct local forms, country-specific ethics committee requirements, certified translations, and portal-specific submission formats.

RFI management (2–4 weeks saved). When an NCA issues a request for information, a specialist drafts a response that also anticipates how the same question may be raised by other authorities whose reviews are still in progress preventing cascading delays across the wave.

Five Steps to De-Risk Your Next Combined Study

Based on the patterns from 40+ programs, these are the five actions that make the biggest difference:

1. Science first: do not underestimate analytical validation data. Analytical data should be traceable and robust, particularly around the cut-off. The APR and IB should be readable as standalone documents NCAs assess them that way.

2. Decide stakeholder ownership early. Sponsor vs Dx partner vs CRO for both the CTR and IVDR pathways. Ambiguous ownership is the single biggest source of delay.

3. Design device-specific endpoints upfront. Analytical and/or clinical, not just drug efficacy. If your performance study plan only lists ORR as an endpoint, expect a rejection.

4. Build the Annex XIII/XIV package early. SVR, APR, CPSP, risk management, GSPR logic evaluate internal capabilities and gaps before the submission clock starts.

5. Use structured tools for multi-country variation. Don’t rely on memory or email threads. Robust study design combined with an informed country strategy is what separates 60-day approvals from 267-day ones.

Looking Ahead: 2026–2027

From our experience, it will get slightly worse before it gets meaningfully better with the inflection point likely in late 2026 to early 2027.

The short-term pressure comes from volume. More sponsors are now aware of IVDR performance study requirements, which means more submissions entering the system. NCA capacity has not grown proportionally. Several smaller Member States still lack dedicated performance study reviewers.

The medium-term improvement will come from three converging developments: MDCG 2025-5 gradually reducing classification disputes, the COMBINE programme’s coordinated assessment pilot producing procedural lessons by mid-2026, and the December 2025 legislative revision proposal delivering structural changes by late 2027.

The biggest variable remains NCA behaviour. Regulatory guidance adoption is uneven and slow. It typically takes 12–18 months from MDCG publication before a clear majority of authorities are operating consistently with it.

For sponsors planning programs in 2026, the practical reality has not changed: plan for divergence between Member States, budget for country-specific regulatory strategies, engage the IVDR workstream at trial design not after the CTR is submitted and do not assume that what worked in one country will work in the next.

Name
Checkboxes

Need Help With Your Combined Study?

MDx CRO has managed 40+ combined programs across 20+ countries with a 100% approval rate and 90+ performance study submissions in the EU27. Our fastest program went from kick-off to full IVD Study Package Development and submission in 4 weeks.

If you are planning a combined study under the CTR and IVDR, talk to our team about how we can accelerate your path to first patient tested.

Frequently Asked Questions about IVDR Combined Studies

What triggers IVDR performance study requirements in a combined study?

IVDR performance study requirements are triggered through three pathways. Article 58.1 requires authorisation for non-CE-marked devices or devices used outside their intended purpose. Article 58.2 requires notification for companion diagnostics that use leftover samples only. Article 70 requires notification for CE-marked devices that involve additional burdensome procedures. Key decision factors include CE mark status for the specific trial use, whether results affect medical management, the study design, the sample type, and the risk profile.

How long does IVDR performance study approval take in a combined study?

Approval timelines vary by Member State. The EU COMBINE Analysis Report 2024 shows an average of 137 days, with a range of 45–267 days. Countries with parallel ethics committee and national authority review, such as Spain (~85 days) and Belgium (~60 days), are faster than those with sequential review, such as Germany, Austria, and Hungary (135–267 days).

What are the most common RFIs in IVDR combined studies?

Based on data from more than 40 combined programs, the most common RFIs include insufficient analytical validation under GSPR 9.1(a), insufficient data supporting the selected cut-off, missing device-specific endpoints in the CPSP, informed consent forms lacking performance study-specific content, and inconsistent objectives between the clinical trial application and performance study documentation.

What changed with MDCG 2025-5 for IVDR performance studies?

MDCG 2025-5, published in June 2025, is the first comprehensive Q&A guidance for IVDR performance studies. It introduces a regulatory pathway decision tree, clarifies that “interventional” in the IVDR context differs from the CTR definition, defines “leftover samples,” and addresses sponsor responsibilities in combined studies. Adoption by national authorities is uneven, and full alignment is expected within 12–18 months.

Will the December 2025 Health Services Pack simplify combined studies?

The Biotech Act proposed in December 2025 introduces a single integrated application for combined studies under the CTR framework. If adopted, it would remove the need for dual CTR and IVDR submissions. Realistic implementation is not expected before late 2027. The COMBINE programme pilot is currently testing coordinated assessment as a bridge to the future framework.

Written by:
Carlos Galamba

Carlos Galamba

CEO

Senior regulatory leader and former BSI IVDR reviewer with deep experience in CE marking high-risk IVDs, companion diagnostics, and IVDR implementation.
Industry Insights & Regulatory Updates

MDx CRO at MPP 2025: Aligning Companion Diagnostics and Drug Development under IVDR

Precision medicine needs alignment, not lighter rules

Europe’s precision medicine ecosystem advances when diagnostics and medicines move in lockstep. The real bottleneck is not regulation itself; it is the structural divergence between the Clinical Trials Regulation and the IVDR. In our work across oncology and rare disease programmes, we repeatedly see how separate clocks, committees, documentation and reporting streams create avoidable friction. Our message at MPP 2025 was simple: bring both tracks together from the start and design one plan that satisfies clinical utility and regulatory rigor at the same time.

CDx and drug trials: bridging IVDR and CTR

When a biomarker guides enrolment or treatment and the assay is not CE-marked for that purpose, Article 58 triggers a performance study alongside the medicinal trial. That study’s endpoints, analytical validation and risk–benefit narrative must be coherent with the drug protocol, because outcomes like PFS, OS and ORR depend on the test defining the right population. Misalignment costs time; EFPIA’s 2023 evidence shows many sponsors facing six to twelve-month delays linked to IVDR requirements, which ultimately pushes patient access further out.

What MDx CRO presented at MPP 2025 and how it will affect 2026

At the Medtech & Pharma Platform Annual Conference on 16 September 2025 at the Novartis Campus in Basel, Carlos Galamba, CEO at MDx CRO, joined the session “IVDs, CDx & Personalized Medicine: Moving from Compliance to Innovation,” chaired by Fatima Bennai-Sanfourche of Bayer and Andreas Emmendoerffer of Roche. The panel brought together Antonella Baron from the European Medicines Agency, Heike Möhlig-Zuttermeister of TÜV SÜD, and patient advocate David Haerry of Positive Council Switzerland, alongside MDx.

Evidence on delays and the impact on patients

The data are unambiguous: EFPIA’s survey indicates 43 percent of companies estimated six to twelve-month delays due to IVDR, with downstream consequences for trial starts and patient inclusion across major disease areas. Every month lost to mis-sequenced processes or unclear governance is a month patients wait for targeted therapies.

Signals from regulators, notified bodies, and patient advocates

The discussion reflected a clear appetite for convergence. EMA perspectives on embedding companion diagnostics under IVDR, TÜV SÜD’s insights on conformity assessment for CDx, and the patient community’s call for earlier access all point in the same direction: coordinated planning and earlier dialogue across agencies, notified bodies and sponsors.

Key insights for 2026 from the MPP panel and fellow presenters

Compliance versus innovation is the wrong debate. The practical path forward is compliance and innovation together: a single evidence plan, shared endpoints, and a unified risk–benefit narrative that treats the diagnostic and the drug as interdependent elements of one therapy journey. That is how companion diagnostics under IVDR accelerate, rather than delay, precision medicine.

How MDx CRO accelerates CDx from design to approval

MDx builds one cross-functional plan from day one, aligning clinical and device protocols, mapping Article 58 triggers, and sequencing submissions so site start-up and “first sample tested” are not held back by documentation gaps. Our teams scrutinise analytical validation, prepare CPSPs and Annex XIV packages aligned to ISO 20916, and train investigators on device-specific safety reporting and sample flows across multilingual EU sites. This integrated approach has delivered a consistent approval track record for CDx submissions.

Operational playbook for combined studies in Europe

Effective combined studies require clear governance between drug and device sponsors, modular and wave submissions across Member States, separate informed consents for the CDx component where appropriate, and proactive scientific advice with EMA or NCAs for borderline cases. With local regulatory intelligence and language capability across Europe, we coordinate roles and documentation so CTR and IVDR remain synchronised throughout the study lifecycle.

Acknowledgment to MPP and our co-presenters

Our thanks to the Medtech & Pharma Platform Association for convening this timely discussion and to the session chairs and speakers who brought regulatory, conformity assessment and patient perspectives to the same table: Fatima Bennai-Sanfourche, Andreas Emmendoerffer, Antonella Baron, Heike Möhlig-Zuttermeister and David Haerry.

Partner with MDx CRO to make CDx work under IVDR

If your programme depends on biomarker-driven enrolment or treatment decisions, partner with a team that speaks CTR and IVDR fluently. MDx CRO compresses timelines, de-risks submissions and delivers companion diagnostics that make precision medicine real for the patients who need it most

Industry Insights & Regulatory Updates

MDx CRO at ESMO 2025 (Berlin): Advancing IVDR Transitions & Combined Clinical Trials

MDx CRO presented new evidence and hands‑on learnings at ESMO 2025 that reinforce our position as the partner of choice for IVDR transitions and combined clinical trials involving investigational IVDs. We were first author on a poster with Fulgent Genetics and contributors to a Servier poster—both centered on the operational and regulatory realities of bringing high‑impact oncology diagnostics into clinical practice under the EU IVDR.

Highlights from our ESMO 2025 posters

Title: IVDR Compliance Challenges in Certifying a Large‑Scale NGS Panel for Hereditary Cancer

What it covers:

  • Practical blueprint for transitioning a comprehensive, service‑based NGS hereditary cancer panel under IVDR.
  • Defining intended use and scientific validity across a large gene set; end‑to‑end technical documentation; bioinformatics validation aligned to IEC 62304/82304; and notified‑body engagement strategy.
  • Lessons on right‑sizing verification/validation and building a living evidence package to support CE‑marking.

Why it matters: Sponsors and lab developers gain an actionable path for moving complex NGS services to IVDR compliance—without slowing clinical programs.

Title: Navigating Regulatory Complexity in Combined Studies under CTR and IVDR (CHONQUER)

What it covers:

  • How combined trials (drug + investigational IVD) trigger dual oversight under CTR and IVDR and the knock‑on effects for timelines, submissions, and site activation across EU member states.
  • Operational patterns that accelerate approvals: early CPS planning, consolidated documentation, and aligned ethics/competent authority strategies.

Why it matters: Oncology sponsors can de‑risk global programs by anticipating IVDR‑specific requirements—and partnering with an IVD CRO that has worked both sides of the fence.

Key takeaways for sponsors

  • IVDR transitions—end to end. MDx CRO supports dossier strategy, clinical performance studies (ISO 20916), scientific validity, and notified‑body engagement for CE‑marking.
  • Combined trials, simplified. We design and run CPS and combined CTR + IVDR studies, harmonizing submissions across multi‑country portfolios.
  • Oncology‑ready operations. Deep experience with molecular prescreening, NGS workflows, and drug–device coordination for precision oncology.

Need a quick debrief? Contact our IVD CRO team for a walkthrough of how these findings translate to your IVDR transition or combined study plan.

FAQs

What does MDx CRO do for IVDR transitions?

We provide end‑to‑end support—from intended‑use definition and scientific validity to clinical performance studies, technical documentation, and notified‑body engagement.

How does MDx CRO support combined CTR + IVDR studies?

We plan and execute CPS and combined trials, consolidating submissions and aligning ethics/competent authority requirements to reduce delays.

Can MDx CRO help with NGS panel validation under IVDR?

Yes. We design right‑sized verification/validation programs and bioinformatics validation aligned with IEC 62304/82304.

Where can I get the ESMO 2025 posters?

Both PDFs are available at the ESMO platform; contact us for a guided readout.

Industry Insights & Regulatory Updates

MDx to Present ESMO 2025 Poster on IVDR CE Marking for Large Germline NGS Panels

Announcement

MDx will present a peer-reviewed poster at the ESMO Congress 2025 in Berlin detailing how our team helped secure IVDR CE marking for a large, service-based germline NGS solution that integrates wet-lab workflows with a validated bioinformatics pipeline. The poster distills a practical, audit-proven pathway that labs and IVD developers can apply when scaling evidence, validating software, and navigating notified-body reviews for complex NGS offerings.

What the poster covers

  • Regulatory strategy and intended use: How to right-size scope for very large panels while planning for future expansion.
  • Technical documentation: Building Annex II/III files that stand up to Stage I/II audits, including labeling/IFU for service-based models.
  • Software validation: Applying IEC 62304/82304 rigor to a bioinformatics pipeline (architecture, V&V, cybersecurity, change control).
  • Evidence at scale: A tiered approach to scientific validity and clinical performance, plus a pragmatic PMPF plan to mature low-prevalence evidence.
  • Operationalization: Supplier controls, change management, and QMS integration to sustain post-market scalability.
Fulgent and MDx ESMO 2025 poster about Certifying Large-Scale NGS panels for hereditary cancer

Why this matters

Large NGS panels pose unique IVDR hurdles: non-uniform clinical evidence across thousands of genes, evolving variant knowledge, third-party components without CE marking, and the need to validate bioinformatics as SaMD. By sharing a repeatable pathway and the pitfalls we overcame, this poster offers concrete guidance to shorten timelines without compromising quality or compliance.

When and where to find us

ESMO Congress 2025 takes place 17–21 October in Berlin, Germany. We will publish our poster board number and presentation time here as soon as the session logistics are confirmed by the organizers. If you’re attending, we’d love to meet to discuss your IVDR roadmap.

Read the background

For context on the underlying program and its market impact, explore the public write-ups:

Ready to talk IVDR CE marking for your NGS product?

Use our contact form to request a 30-minute slot with our regulatory and bioinformatics leads during ESMO 2025, or schedule a virtual follow-up the week after the congress.

Industry Insights & Regulatory Updates